It is necessary to connect each part of the belt frame firmly

2024-07-27 343

1. Before starting up, it is necessary to carefully maintain and inspect all parts of the machinery, as well as pay attention to whether there are people or other debris on the belt. Only when there are no issues can the signal be sent to drive. When multiple belts are connected in series, the starting sequence is from the unloading end to the feeding end.
2. After starting, idle for 3-5 minutes first, and only when all parts are checked to be normal, can the load work be carried out.
3. In the future, it is necessary for the operators of the belt conveyor to gather their thoughts and stick to their posts. The personnel guarding the belt should frequently patrol along the line, identify problems, and clean them up in a timely manner.
4. If abnormal phenomena such as belt deviation, slipping, jumping, etc. are found during work, they should be adjusted in a timely manner. Do not stuff anything between the pulley and the belt when the belt slips. The tightness of the belt is not appropriate, and the tensioning equipment should be adjusted in a timely manner.
5. In work, it is important to pay attention to checking whether the electric motor, gearbox, transmission gear, bearing shell, coupling, transmission belt, drum, roller, etc. are normal; Is it useful to clean the scraper and brake equipment? It is necessary to ensure that the brake equipment for the up and down belts is absolutely reliable to avoid speeding.
6. The various parts of the belt frame must be firmly connected, without cracks, deformations, or abnormal movements.
7. Regularly check the grounding maintenance and insulation condition of electrical equipment. Electric motors should be measured and regularly maintained to avoid exposure to sunlight and rain.
8. In mechanical work, it is prohibited for anyone to walk across the belt, ride on the belt, sleep on the belt, etc.
9. High pressure water is often used to wash away the soil stuck to the belt pulley in work. It is forbidden to use a triangle rake, shovel, mallet, etc. for cleaning without stopping the machine.
10. When placing goods on the belt, they must be evenly distributed to avoid overloading and crushing the belt, which may affect the safety of the machinery.
11. Prohibit heavy vehicles from parking during work (urgent matters outside); If there is a sudden power outage, the tension switch should be pulled up immediately.

12. Before stopping the machine, the feeding should be stopped first, and the signal to stop the machine can only be sent after all the materials on the belt have been unloaded. When multiple belts are connected in series, the shutdown sequence is from the feeding end to the discharging end.